![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Call us at 316-440-2828 |
[Page1] [Page2] [Page3] [Page4] [Page5] REBCO MACHINE 2009 PRICE LIST
Price list for piston alteration operations performed by Rebco Machine. This list is intended for general reference only. Due to the variety of piston styles and stages that are available, actual billing will be based upon operations required to complete a work order.
HIGH PRIORITY SERVICES
WE OFFER PRIORITY EXPEDITING SERVICES FOR THOSE IN NEED OF IMMEDIATE RETURN OF PISTONS. THE FOLLOWING FEES ARE IN ADDITION TO REGULAR PRICING. NO DISCOUNTS WILL BE GIVEN. FEES ONLY APPLY TO SERVICES REQUIRED TO COMPLETE THIS SERVICE. (SERVICE MAY NOT ALWAYS BE AVAILABLE DUE TO CIRCUMSTANCES BEYOND OUR CONTROL)
SAME DAY IN/OUT 25% NEXT DAY OUT 15%
Listed prices are for a minimum of four pcs. Less than 4 pcs. will be prorated from base price list as noted. Price listed is per part unless otherwise noted. One pc.- 180% Two pcs.-160% Three pcs.- 140%
Minimum work order billing $40.00
Dome Profiling
Dome Profiling per chamber mold or sample pistons 3-d dome Profile, multiple levels
Right and Left hand chambers will require Right and Left hand patterns.
COMPRESSION HEIGHT
Valve relief prices listed are per pocket, intake or exhaust. Plunge cuts include elliptical pocket with offset entry and exit angles and trim shroud height.
FABRICATE CHAMBER MOLDS
GAS PORTS
[Page1] [Page2] [Page3] [Page4] [Page5] |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
© Copyright by Rebco Machine 2005. All rights reserved. Reproduction of material appearing on this Web site is strictly prohibited without written permission. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||